Lawn with flower edges being prepared in front of Site Office

One of the two Deep Trenches  for HDPE mainlines  from the overhead tank to the field being dug up, Length – Approx. 1.75 kms.

Mainline trench being connected to the second main line trench at a distance of approx. 600 M

 